A heat pump, an induction range, a heat pump water heater and a car charger. Any one of them usually fits. All of them together often do not, and the order you do them in decides whether you pay for one upgrade or two.

Which calculation this is. The existing dwelling method, NEC Article 220.83. It answers whether the service you already have carries what you are adding. If you are building new, or taking a house back to studs, the service size calculator is the one you want, because it sizes a service from scratch instead.

Do it all at once, on paper at least

You do not have to install everything this year. But you should calculate everything this year, because the answer changes depending on what else is coming. A house that takes a heat pump today might not take a heat pump and a charger, and finding that out after the heat pump is in means a second visit, a second permit, and a service upgrade you could have done once.

Check everything you are considering in the first section, even the parts that are two years out. Leaving one off is the most common way this calculation comes back reassuring and wrong.

Gas now, going electric

In the appliance section, that is its own answer, separate from "electric". It matters more than it looks. An appliance that is already electric is load your service has been carrying for years. One you are converting is load that is not there yet, and the code counts the two differently. On an electrification job nearly everything is a conversion, so this is the page where getting it right changes the number most.

1. What are you adding?

Check everything that applies. The calculation measures the electrical service already on your house against everything you want to add, so it needs the whole list. Adding two things in the same year is common, and the answer is not the same as adding either one on its own.

2. Your meter

Match the picture. Nothing needs opening.

Which meter base looks like yours?

This is the meter on the outside of your house, not the breaker panel inside. If you can, measure the metal box — about 15 inches tall is the standard 200 A size, and that one number tells us a lot about what your upgrade would involve.

Pick the one that looks closest. If none of them match, choose “Not sure” — a photo settles it faster than a description.

Whatever you pick here, the utility has to cut power and give us access to the meter before any work on the service can start. We arrange that with them.

Only if you know it for certain — from an inspection report, a previous permit, or an electrician who told you. Please don’t open the meter to check. Leave it blank if you’re not sure; the picture above is enough to get started.

3. The panel

Check anything that matches. Skip anything you're unsure of, because a wrong guess here is worse than a blank.

What's on it

Room inside

4. The house

Seattle amends the electrical code separately from the rest of the state, and the EV charger figure is one of the things it changes.
Not counting an unheated garage.
An ADU, a mother-in-law unit, a wet bar with its own circuits. Rare, but each one adds about 3,000 VA before a single appliance is plugged in.

5. Kitchen appliances

The two small-appliance circuits every kitchen has already cover whatever is plugged into them. An appliance only gets counted separately if it is built in, hardwired, or on its own breaker.

A countertop microwave on a kitchen outlet: already counted, leave it unchecked. An over-the-range or built-in one: check it. Dishwashers and disposals are almost always hardwired or dedicated. Refrigerators vary and are hard to tell from the outside, so if you are not sure, check it anyway. That is the cautious side and it will not undersize you.

6. The big ones

Gas appliances draw nothing electrically, so a house on a gas range has more room than the same house all-electric.

7. Heating and cooling now

What is in the house today, before anything you are adding. Heating and cooling never run at the same time, so only the larger of the two counts.

8. Anything else

Sauna, pool or well pump, shop subpanel, welder, second panel. Anything fastened in place that the list above missed. Use the nameplate figure, not an estimate of what you think it draws.

Already have an EV charger?

If it comes back short

That is not the end of the plan, it is a fork in it. Sometimes the answer is a service upgrade. Sometimes it is load management on the charger, which is a control change rather than a service change. Sometimes it is doing the heat pump this year and the charger after the upgrade. Hanco Electric will walk through which of those fits your house and your budget, and quote the work either way.

What a 200A service upgrade involves →

This is a planning estimate from Hanco Electric, based on what you entered and on the code edition and local amendments for the city selected. It is not a design, not a permit submittal, and not a substitute for a licensed electrician evaluating your installation on site. The authority having jurisdiction has the final say on any load calculation.