A full NEC load calculation, starting from nothing. Square footage, the appliances, the heating, and anything you plan to add.
Which calculation this is. The optional method for a dwelling unit, NEC Article 220.82. It sizes a service that does not exist yet. If instead you are adding one thing to a service you already have, the EV charger and heat pump calculators use the existing dwelling method, NEC 220.83, which is the one an inspector will expect for that job.
Important disclaimer. This calculator is provided for general estimation purposes only and does not constitute professional electrical advice, engineering analysis, or a code compliance determination. Results are based on what you enter, under the NEC Article 220.82 optional method for the code edition you select. Actual loads, service sizing requirements and upgrade needs vary with specific appliance nameplate ratings, utility requirements, local amendments to the NEC, physical inspection of existing wiring, and other site conditions this tool cannot assess. No electrical work should be planned, permitted, or performed based solely on the results of this calculator. Hanco Electric LLC assumes no liability for decisions made from this output. Always consult a licensed electrician for a proper load calculation and an on-site evaluation.
Use nameplate ratings wherever you have them. The optional method counts appliances at their full nameplate value, so a real number beats a good guess every time. Where you do not have one, there is an estimate option and the result will tell you which figures were estimated.
One thing worth knowing up front. The optional method does not use the range and dryer demand tables. Under 220.82 a range counts at its full nameplate rating, not the reduced Table 220.55 figure, and there is no 5,000 VA dryer minimum. That is why this calculation can come out differently from one done the standard way, and both are correct.
This is a planning estimate from Hanco Electric, based on what you entered and on the code edition selected. It is not a design, not a permit submittal, and not a substitute for a licensed electrician evaluating the installation on site. The authority having jurisdiction has the final say on any load calculation.